There’s $5,000 on the table from Austin Water for all customers. All it takes to apply is to

Priorities: Walkway Safety Hazard – Reduce Pressure on Heritage OakChallenges: Tight Scheduling – Balance Elements of Hardscape and

Priorities: Remove Dense Brush – Treat for PreventionChallenges: Tight Corridors – Trip Hazards – PollutionSolutions: Safety Focus –

Priorities: Safe Landscaping For All Ages – Engaging Natural Play StructuresChallenges: Poor Drainage – Tight Safety ConstraintsSolutions: Deep

Priorities: Troubleshoot Prolonged Irrigation System FailureChallenges: Multiple Failed Prior Attempts – No Plan Documents – One Urgent ScopeSolutions:

At St. George’s Episcopal School, a playground overhaul was overdue. When the school approached Maas Verde, our designers